Valve Greasing Technician
- Dammam, Ash Sharqiyah
- Permanent
- Full-time
leaking / passing of valve by applying suitable sealants.Below are basic responsibilities:
1. Check the condition of the valve and passing condition.
2. Check the line pressure.
3. Check the injection fitting for its functionality and start flushing the valve
with flush/ cleaner.
4. Replace defective injection fitting with new one.
5. Wait for 2-4 hours and start applying Sealant at seat area to stop the
leakage.
6. In case, leakage doesn’t stop, apply special cavity sealants to fill in body
to stop the leakage.
7. Maintain the equipment and tools in safe manner.
8. Perform routine maintenance on sealant and Flush pumps to ensure they
are in good working condition.Qualification:
ITI- or any equivalent / OR Secondary pass.
Min 3-4 years’ experience in similar job in Oil & Gas sector.
Expatriates